BSA Lifestructures

SDGH ICU Renovation

{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true"}

St. David’s Georgetown Hospital added to their ICU capability by renovating a second floor of the administration building and adding architecture to the adjacent roof to complete the floor footprint of a 14- bed ICU.

This renovation was completed in March of 2016. The 13,000 sq. ft. renovation provides 14 new ICU beds, and includes 2 Isolation rooms.

Project Statistics

    • Client:
    • SDGH
    • Location:
    • Georgetown, Texas
    • Size:
    • SF
    • Year Completed:
    • 2016
    • Service Provided:
    • Architecture, Interior Design